Place of Origin: | Guangdong, China (Mainland) |
Brand Name: | RUIHUI |
Certification: | CE, ISO certification |
Model Number: | MEW |
Minimum Order Quantity: | 1 Set |
---|---|
Packaging Details: | Wooden Box or Vacuum Packing |
Delivery Time: | 30 work days |
Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability: | 30 Sets Per Month |
Stock Width(mm): | 20-800mm | Pressing Arm: | Pneumatic |
---|---|---|---|
Warranty Period: | 12 Months | Coil Material: | Matal Steel Or Aluminum Sheet |
Coiling Block Expansion Mode: | Hydraulic/Manual | Certification: | CE, ISO |
High Light: | 800mm Steel Coil Uncoiler,Pneumatic Steel Coil Uncoiler,Hydraulic Stamp Line Steel Uncoiler |
Inner Diameter Adjustment Steel Decoiler Mandrel Decoiler For Hydraulic Stamp Line
1. Before the roller feeder is running daily, it is necessary to carefully check the feeder first to ensure that there is no chipping or foreign matter in the gear contact part, the cross joint is not worn, the contact surface of the loose shaft is not worn, the pressure plate is not blocked, and The bolts of each component are not loose.
2. After the press is changed, the adjustment screw on the mounting plate should be adjusted to the roller feeder to adjust the feeding height. The adjustment principle is slightly lower than the lower mold of the comparable mold, and the material cannot be introduced into the mold guide column first. Adjusting the height of the feeder, this method can easily damage the mold.
3. Before running the feeder, it is necessary to carry out the trial die after the normal operation, and then carry out continuous stamping and feeding. During the operation of the feeder, it is necessary to pay attention to whether the delivery distance is accurate and whether the material is skewed. If it is found that there is abnormal feeding, it should be stopped immediately for inspection and re-commissioning.
4. After the delivery of a roll of material is completed, it is necessary to stop the punching machine in time to prevent the punching machine from accidentally hitting the mold.
5. It is necessary to regularly lubricate the roller feeder. For the wear and tear of spare parts caused by long-term work, it is necessary to contact Ruihui mechanical technicians for replacement.
GUANGDONG RUIHUI MACHNIERY MANUFACTURE CO.,LTD established in 2000, We are growing from a Japanese sheet metal peripheral automation parts processing plant to a professional manufacturer of sheet metal stamping peripheral automation equipment with the same technology as Japanese brand. The company has always followed technology of Japan and Germany, and has a high standard principle in the selection and matching of parts. For the assembly process and spare parts, we insist in meeting original design standards and infiltrate them into every manufacturing process.
At present, in order to further develop the market, Ruihui has expanded the scale of business with the concept of “Accumulating talents, Taking essence of international technology and creating great brand” By the end of 2017, Ruihui has further expanded its scale, with a total investment of 50 million RMB and more than 25000 square meters manufacture area. It had laid a solid foundation for meeting the needs of future market.
*1:(Pneumatic):Option in case of pneumatic mandrel expansion is provi
Contact Person: Calin Deng
Tel: 13826917409
Fax: 86-769-89296723
Phase Style Automatic Nc Servo Sheet Metal Coil Feeder Stam
High Speed Nc Servo Roll Feeder For Matel Coil Machine Pneumatic release RNC-800HA
Punching Steel Straightening Nc Servo Feeder Machine / Nc Roll Feeder
OEM CCS Nc Servo Roll Feeder and Uncoiler Straightener RNC-400F
Auto High Speed Steel Coil Feeder Machine For Continuous Multiple Project Processing
Latest High Speed Mechanical Roll Feeder / Punch Press Feeder
Precision Coil Decoiler Straightener Feeder For Metal Stamping / Stainless Steel
Uncoiler And Decoiler Straightener Press Feeding Equipment For Sheet Metal
Coil Sheet Automatic Decoiler Straightener Feeder For Press Line(MAC4-800F)